Get the free guide
Free guide · Building in Southern Tasmania

Read this beforeyou build in Tasmania.

What really decides the cost of a custom home here: your site, your council and the order you design and price it in. From the team that designs, prices and builds homes across Southern Tasmania.

  • Why an advertised base price rarely survives a sloping block
  • What Kingborough, Clarence, Sorell and Hobart councils ask of a design
  • How to build warm for Tasmania's Climate Zones 7 and 8
  • Real numbers: typical budgets, stage prices and timelines

Where should we send your guide?

Free PDF, straight to your inbox.

We'll only use your details to send the guide and follow up about your project.

Your guide is on its way.

1 of 4

While it sends, four quick questions so our follow-up is useful to you.

Do you have a site?

Thanks. Check your inbox.

Your guide is on its way. If you'd like to talk your site, budget or timing through, a 15-minute call is the quickest way.

Concept preview. On launch, the email and your answers go straight into the CRM with the ad that brought you here, so the follow-up is about your project, not a generic sequence.

Before you build in Tasmania, guide cover
Free PDF guide
Harry Friend, Axis Homes
Why we wrote it · 60 seconds

Video placeholder. Filmed during onboarding with whoever from the team suits: Harry, Nick or Billy.

From the people who design and build them

One team, from first sketch to handover.

Axis Homes was founded by Harry Friend, a graduate architect and licensed builder, after years of watching projects suffer from disconnected teams and miscommunication. The guide covers the questions we talk through in first conversations, before anything is drawn.

25+ homes delivered across Southern Tasmania. Spring Beach won the 2025 HIA Tasmanian Custom Built Home up to $750,000, and the Corrugated Cabin was a National HIA GreenSmart Sustainable Home finalist.

What's inside

Five chapters. Straight answers.

Sample pages from the guide
01

The truth about base prices

What a standard floorplan price assumes, and the three site factors that add to it: site preparation, orientation and topography.

02

Design and price together

Why budgets blow out when the team drawing your home isn't the team quoting it, and how pricing early keeps a project viable.

03

Your site and your council

Bushfire ratings, tree protections, coastal guidelines and stormwater: how Tasmanian councils shape a design.

04

Building warm in Climate Zones 7 and 8

Passive solar orientation, thermal bridging, airtightness and the materials that last in Tasmanian UV and salt air.

05

Real numbers and timelines

Typical budgets, what each stage costs, how long approvals and construction take, plus a checklist to see if your project's ready.

Get the free guide
25+

Homes delivered across Hobart, Southern Tasmania and the East Coast

From $4,950

Concept design: floor plans, 3D visualisations and a preliminary construction quote

~9 + 9 months

As a guide: around nine months for approvals and nine for construction

Start with the guide

Know what decides the cost before you commit.

Read it at your own pace. When you're ready to talk about your site, the conversation's free and there's no obligation.

The Axis Homes team